Transformers, switchgear, and substation equipment, fulfilled for your project

HamidiTec

HamidiTec fulfills new and refurbished high- and medium-voltage transformers, breakers, switchgear, and related substation gear. That includes generator step-up and main power transformers when they are part of a generation or interconnection project.

Send the voltage, the approximate capacity, the site, and the timeline. We review each request privately. This page is not a catalog. We do not publish models, unit counts, prices, or availability. Buyers purchase direct from the vendor or manufacturer.

If the reason you are here is a long factory wait for a new transformer, read Power transformer lead times first, then send the project on the form. That guide summarizes published industry surveys. It is not a HamidiTec delivery date. We do not publish delivery dates on this site.

Request a Quote

What this page covers

  • Main power and generator step-up transformers
  • Other HV/MV power and substation transformers that are part of a real project
  • HV/MV breakers and switchgear
  • Related substation equipment
  • New and refurbished equipment

HamidiTec’s generation conversations typically fall in a range of about 2 MW to 130 MW. Electrical requests are reviewed in the context of the project they support. Send the megawatts or MVA you actually need, along with the voltage if you know it.

Why transformer and substation requests come in with a generation project

A plant or a large site rarely buys a gas turbine or a genset in isolation. The machine has to interconnect. That usually means a generator step-up transformer, often with breakers, switchgear, and other substation equipment. Data-center and industrial sites have the same pattern when they add on-site generation or a new service.

It is better to put generation and electrical scope on one quote request than to split them. If you are also looking at gas turbine generators, aeroderivatives, gas gensets, or data-center power, check every item that applies.

New and refurbished electrical equipment

We fulfill both. Refurbished transformers and related gear are often discussed when a project’s schedule cannot absorb a multi-year wait for a new large unit, or when a unit of the right class can be prepared for a new site. New equipment is often discussed when the specification, the utility, or the long-term plan requires it.

Public industry surveys in 2025 and 2026 have described long waits for new large power and generator step-up transformers — often measured in years, and longer for the more complex high-voltage units. Those figures come from utility surveys and market reports, they change, and they are not a quote from HamidiTec. The lead-times guide explains how to read them and what to send so a private review can start.

We will not list units on this page, and we will not promise a delivery date in public copy.

Request a Quote

What to include in a quote request

Electrical requests move faster when the form has enough technical context to be reviewed. You do not need a complete specification to start. Useful starting points:

  • Voltage, if you know it (for example, a high-side and low-side, or a nominal interconnection voltage)
  • Approximate capacity in MVA or MW
  • Whether the unit is a generator step-up, a main power or substation transformer, or you are still defining the role
  • Site location at least to the city, county, or state
  • Timeline or target date, even if it is only a quarter or a year
  • New, refurbished, or either
  • Breakers, switchgear, or other substation gear that belongs with the same project
  • Whether a one-line or a specification can be shared after an NDA

If you want an NDA first, check that box or say so in the notes. Do not attach bid-sensitive documents until that is in place.

Who this is for

Utilities, developers, industrial sites, data-center teams, EPCs acting for an owner, and funds that directly back a project. Intermediaries should not use the form to shop equipment.

HamidiTec is based in the Maitland / Orlando, Florida area and works with project teams nationwide.

How purchasing works

If the requirement is a fit, we follow up with matched options. Buyers purchase direct from the vendor or manufacturer. HamidiTec fulfills the match and the introduction. If it is not a fit, we will say so.

FAQ

What electrical information should I include?

Voltage, approximate capacity (MW or MVA), site location, and timeline are the most useful starting points. If you have a one-line or a specification you can share after an NDA, say so on the form.

Do you fulfill both transformers and breakers?

Yes. We fulfill transformers, breakers, switchgear, and related substation gear, new and refurbished. Check every item that applies.

Do you post units for sale?

No. We do not publish models, unit counts, prices, or availability on this site. Matched options are discussed privately with qualified project teams.

Can you discuss a project that is waiting on a long transformer lead time?

Yes. Send the voltage, capacity, site, and timeline, and say whether new, refurbished, or either is acceptable. For public market context, see Power transformer lead times. We do not publish HamidiTec delivery dates.

Who does the buyer purchase from?

Buyers purchase direct from the vendor or manufacturer.

Can a transformer request include a gas turbine or genset on the same form?

Yes. Check every equipment type that applies so the project can be reviewed as a whole.

Related

Power transformer lead times · Gas turbine generators · Data-center power · Urgent power equipment · Request a Quote

<!– END_COPY –>

Scroll to Top