Project teams looking for a main power transformer or a generator step-up unit are often reacting to the same problem: a new factory conversation that does not line up with the date the site has to be ready. That is a market issue, not a reason to publish a catalog. This page explains how to read the public lead-time discussion, what to send in a quote request, and how HamidiTec reviews new and refurbished transformers and substation gear.
HamidiTec does not publish delivery dates, prices, models, or availability on this site. The figures below come from published industry surveys and reporting. They change, they vary by voltage and rating, and they are not a quote from HamidiTec.
What public surveys have been saying
Utility and market surveys in 2025 and 2026 have described long waits for new large power transformers and generator step-up units. An Electric Power Research Institute paper published in November 2026, based on utility surveys in 2024 and 2026, reported elapsed times from order to delivery of roughly 24 to 48 months for power transformers, depending on voltage and MVA, and a wide range for high-voltage circuit breakers. The paper noted that those waits had not returned to pre-2020 norms.
Trade and market reporting in the same period has put many substation power transformers and generator step-up units in a multi-year range as well, with more complex high-voltage units often longer than standard units. Distribution equipment and large power equipment do not behave the same way, so a single “transformer lead time” number is rarely enough to plan a project.
Use those ranges as context, not as a promise. A specific unit’s timing depends on rating, voltage, specification, factory slot, and the path the project actually takes — new, refurbished, or a comparison of both.
Why this matters on generation and data-center projects
A gas turbine or genset does not interconnect by itself. The generator step-up transformer, and often the breakers and switchgear around it, can sit on the critical path just as much as the machine. Data-center and industrial sites see the same pattern when they add on-site generation or a new high-side interconnection.
If generation and electrical scope belong to the same project, put them on one form. Splitting the transformer request from the machine request makes the review harder and can hide a constraint that the owner already knows about.
New equipment, refurbished equipment, and a private comparison
HamidiTec fulfills new and refurbished HV/MV transformers, breakers, switchgear, and related substation gear. Refurbished equipment is often part of the conversation when a project cannot plan around a multi-year wait, or when a unit of the right class can be prepared for a new site. New equipment is often part of the conversation when the specification, the utility, or the long-term plan requires it.
Neither path is a public listing. We will not post “in-stock transformers” on this page, and we will not use a published week-count as a HamidiTec commitment. The useful work happens after we understand voltage, capacity, site, and timeline.
If the whole project is on a compressed schedule, not only the transformer, see Urgent power equipment.
What to send so a review can start
You do not need a complete specification to start. The most useful details are:
- Voltage, if you know it, including high-side and low-side when you have them
- Approximate capacity in MVA or MW
- The role of the unit: generator step-up, main power or substation transformer, or still being defined
- Site location at least to the city, county, or state
- Timeline or target date, even if it is only a quarter or a year
- Whether you want new equipment, refurbished equipment, or a comparison of both
- Breakers, switchgear, or other substation gear that belongs with the same project
- Whether a one-line or a specification can be shared after an NDA
Check the NDA box on the quote form if you want that in place before drawings move. Do not attach bid-sensitive files until then.
How HamidiTec handles the request
Submissions are reviewed privately by Salem Hamidi, Principal, Equipment Fulfillment. If the requirement is a fit, we follow up with next steps and, when it is useful, with matched options. Buyers purchase direct from the vendor or manufacturer. If it is not a fit, we will say so.
HamidiTec is based in the Maitland / Orlando, Florida area and works with project teams nationwide. The quote form is for owners, developers, utilities, EPCs acting for an owner, and funds that directly back a project — not for intermediaries shopping a list.
FAQ
What is a typical lead time for a new power transformer right now?
Public utility and market surveys in 2025 and 2026 have described multi-year waits for many new large power and generator step-up transformers, often longer for more complex high-voltage units. Those figures change and are not a HamidiTec quote. Send your voltage, capacity, site, and timeline for a private review.
Do you publish HamidiTec delivery dates?
No. We do not publish delivery dates, prices, models, or availability on this site.
Can refurbished transformers be part of the conversation?
Yes. We fulfill new and refurbished transformers and related substation gear. Say which path you want to discuss, or that either is acceptable.
What information do you need to review a transformer request?
Voltage, approximate MVA or MW, the role of the unit, site, and timeline are the best starting points. A one-line or specification can follow, under an NDA if needed.
Can I include a gas turbine or genset on the same request?
Yes. Check every equipment type that applies so generation and electrical scope can be reviewed together.
Who does the buyer purchase from?
Buyers purchase direct from the vendor or manufacturer. HamidiTec fulfills the match and the introduction.