Gas-fired generator sets for prime and standby power

HamidiTec

HamidiTec fulfills new and refurbished gas-fired generator sets for prime and standby power. Tell us the capacity, the site, the fuel, and the timeline. We will review the request privately. Buyers purchase direct from the vendor or manufacturer.

This page is for packaged gensets and related generator conversations — including project needs that are often described as roughly 2 MW, 5 MW, or 10 MW, as well as other sizes in the range we discuss. Those figures are examples of project scale, not a list of units. Larger gas turbine generators and aeroderivative packages are covered on their own pages. If you are still deciding which class of generation fits the site, describe the load and the duty and we will follow up.

We do not post a catalog, prices, or availability on this site.

Request a Quote

What this page covers

  • Gas-fired generator sets for prime power, standby, or a combination of the two
  • New and refurbished equipment
  • Packaged generation conversations in the range HamidiTec typically discusses, about 2 MW to 130 MW
  • Related electrical or HVAC equipment when it is part of the same project
  • On-site generation that supports an industrial plant or a data-center load

Natural gas is the usual fuel discussion. If the project is dual-fuel or another fuel, say so on the form. If the request is outside what we fulfill, we will tell you.

Prime power and standby are different conversations

Prime power usually means the set is expected to run as the main electricity supply for a site or a process, often for long hours. Standby usually means the set is there to cover an outage or a defined backup window. Some sites need both, or they need a set that can be permitted and installed in one configuration and operated in another later.

Those distinctions matter more than a generic “generator for sale” search. They change the duty, the fuel arrangement, the electrical interface, and sometimes the cooling and switchgear around the set. Put the duty in the notes so the review starts from the actual project.

Mid-size project needs (including 2 MW, 5 MW, and 10 MW)

Many industrial, commercial, and smaller compute sites describe a need in the mid-size range — a few megawatts up to around 10 MW, sometimes as a single set and sometimes as a combination of sets. Other projects are larger and still belong on this page if the right equipment is a packaged genset rather than a gas turbine.

When you write “about 2 MW,” “about 5 MW,” or “about 10 MW” on the form, treat it as a description of load, not as a request for a named unit from a public list. We do not publish a roster of sets in those sizes. We use the number to understand the project.

If the site may grow, give the first-phase size and the later size if you know it. If several sets will operate in parallel, say so.

Request a Quote

What to include in a quote request

  • Approximate capacity in megawatts, or a range
  • Prime, standby, or both
  • Fuel: natural gas, dual-fuel, diesel, or other
  • Site location at least to the city, county, or state
  • New, refurbished, or either
  • Timeline or target date
  • Voltage or interconnection notes if you have them
  • Whether transformers, switchgear, or cooling are part of the same requirement

Check the NDA box if you want that in place first. Do not send bid-sensitive attachments or unnecessary personal data.

Related equipment and nearby pages

A genset request often travels with electrical gear and, on power-dense sites, with cooling. Include those items on the same form so the project stays in one conversation. If the right machine may actually be a gas turbine or an aeroderivative, we will say so rather than force the request into the wrong class.

For on-site generation that is meant to sit behind the utility meter at a compute campus, read Behind-the-meter gas power for data centers and then send the project. For a tight schedule, see Urgent power equipment.

Who this is for

Industrial sites, data centers, developers, utilities, other project owners, EPCs acting for an owner, and funds that directly back a project. Intermediaries should not use the form.

HamidiTec is based in the Maitland / Orlando, Florida area and works with project teams nationwide.

How purchasing works

If the requirement is a fit, we follow up with matched options. Buyers purchase direct from the vendor or manufacturer. HamidiTec fulfills the match. Pricing is not published on this website. Quote discussions happen privately after we understand the requirement.

FAQ

Do you fulfill only natural-gas gensets?

Natural gas is the usual discussion. If the project is dual-fuel or another fuel, say so on the form. If the request is outside what we fulfill, we will tell you.

Can you help with standby as well as prime power?

Yes. Describe the duty in the notes so we know whether the set is for prime power, standby, or both.

I need something on the order of 2 MW, 5 MW, or 10 MW. Is that in range?

Yes, those are examples of project sizes we can discuss, along with other capacities in the range of about 2 MW to 130 MW. Send the size you need. This website does not list sets in those sizes.

Will I see pricing on this website?

No. Pricing is not published here. Quote discussions happen privately after we understand the requirement.

How is the purchase completed?

Buyers purchase direct from the vendor or manufacturer. HamidiTec fulfills the match and the introduction.

Can I include electrical or HVAC equipment on the same form?

Yes. Check every equipment type that applies and describe the project so generation and the supporting gear can be reviewed together.

Related

Gas turbine generators · Aeroderivatives · Data-center power · Commercial HVAC · Transformers and substation gear · Urgent power equipment · Request a Quote

<!– END_COPY –>

Scroll to Top